Entre Terras e Maresvideo

WE FINISHED the bow cabin LAMINATE ! S1.ep182

28 June 2026 · 21 min · 354 views

What this video covers

Edgar and Sâmia completed the laminate interior finishing in the bow cabin of their boat, transitioning from dark surfaces to a lighter aesthetic.4:26 The project involved cutting and bonding laminate sheets to cabin walls, storage doors, and the navigation station.2:30 To maximize interior brightness, the crew used beige laminate for non-visible storage areas and the base of the bed frame.9:33 They applied edge banding to exposed sections and installed hardware, including door handles, USB ports, and lighting fixtures.8:15 The team utilized a flame-retardant, aluminum-backed insulation material called "protelhado" to line the ceiling and provide thermal protection.17:26 Future plans for the cabin include installing a reflective, mirror-like laminate sheet inside a small vanity table and adding three internal shelves to a storage locker.18:00 The cabin renovation remains ongoing, with the floor and ceiling panels still requiring final installation.18:59

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep180May 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue