Sven Yrvindvideo
Working on the Sheets.
7 August 2026 · 5 min
What this video covers
Sven Yrvind prepares electrical and rigging components for his boat in a workshop. He acquires a digital multimeter to monitor battery voltage, noting the red and black leads for terminal connection.0:42 He also stocks up on fuses and miscellaneous hardware.0:20 Turning to the rigging, he addresses a failure in the sheet attachment system after a component falls from the boom.2:20 He fabricates a new block attachment point using a 50-centimeter length of line secured with knots, routing it through existing holes in the boom structure.3:16 He applies fast-acting glue to the nuts on the interior fittings to ensure they remain secure.4:57 He plans to utilize a cleat intended for the anchor to manage the sheet lines and considers using the same attachment points for the topping lift.2:34
More from Sven Yrvind
From Sven Yrvind — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



