Sven Yrvindvidéo
Working on the Sheets.
7 août 2026 · 5 min
Ce que couvre cette vidéo
Sven Yrvind prepares electrical and rigging components for his boat in a workshop. He acquires a digital multimeter to monitor battery voltage, noting the red and black leads for terminal connection.0:42 He also stocks up on fuses and miscellaneous hardware.0:20 Turning to the rigging, he addresses a failure in the sheet attachment system after a component falls from the boom.2:20 He fabricates a new block attachment point using a 50-centimeter length of line secured with knots, routing it through existing holes in the boom structure.3:16 He applies fast-acting glue to the nuts on the interior fittings to ensure they remain secure.4:57 He plans to utilize a cleat intended for the anchor to manage the sheet lines and considers using the same attachment points for the topping lift.2:34
Plus de vidéos de Sven Yrvind
De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



