Sven Yrvindvídeo
Working on the Sheets.
7 de agosto de 2026 · 5 min
Qué cubre este vídeo
Sven Yrvind prepares electrical and rigging components for his boat in a workshop. He acquires a digital multimeter to monitor battery voltage, noting the red and black leads for terminal connection.0:42 He also stocks up on fuses and miscellaneous hardware.0:20 Turning to the rigging, he addresses a failure in the sheet attachment system after a component falls from the boom.2:20 He fabricates a new block attachment point using a 50-centimeter length of line secured with knots, routing it through existing holes in the boom structure.3:16 He applies fast-acting glue to the nuts on the interior fittings to ensure they remain secure.4:57 He plans to utilize a cleat intended for the anchor to manage the sheet lines and considers using the same attachment points for the topping lift.2:34
Más de Sven Yrvind
De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



