Sven Yrvindvideo
Working on the Sheets.
7 agosto 2026 · 5 min
Cosa tratta questo video
Sven Yrvind prepares electrical and rigging components for his boat in a workshop. He acquires a digital multimeter to monitor battery voltage, noting the red and black leads for terminal connection.0:42 He also stocks up on fuses and miscellaneous hardware.0:20 Turning to the rigging, he addresses a failure in the sheet attachment system after a component falls from the boom.2:20 He fabricates a new block attachment point using a 50-centimeter length of line secured with knots, routing it through existing holes in the boom structure.3:16 He applies fast-acting glue to the nuts on the interior fittings to ensure they remain secure.4:57 He plans to utilize a cleat intended for the anchor to manage the sheet lines and considers using the same attachment points for the topping lift.2:34
Altro da Sven Yrvind
Da Sven Yrvind — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



