Sailing Magic Carpetvídeo

How To Build A Sailboat Rig: Roller Furlers.

23 de agosto de 2024 · 27 min · 61K visualizações

O que este vídeo aborda

Refitting a Cape George Cutter 36 requires replacing the forestay and staysail stay with new wire and installing roller furling systems.3:39 The project utilizes mechanical Stay-Loc fittings rather than swaged terminals, allowing for field inspection and repair without specialized hydraulic swaging equipment.4:37 The process involves measuring the existing pin-to-pin length, unlaying the wire strands to seat the cone, and securing the fitting with marine-grade silicone and red Loctite.5:06 Aluminum foils are then cut to length to encase the wire, providing an aerodynamic profile and a track for the sail.15:34 Because mechanical fittings do not pass through the foil extrusions, the foils must be loaded onto the wire before the final bottom fitting is attached at the boat.14:11 Maintenance for the Italian-made Balmar furling units consists of regular fresh water rinsing and applying Tef-Gel or Lanocote to fasteners to prevent corrosion and ensure future disassembly.22:42 Proper articulation is achieved by installing toggles at both the top and bottom of the stay.12:25

Assistir no YouTube

Barcos neste vídeo

Cape GEORGE 38O barco deles

Mais de Sailing Magic Carpet

We're Starting to Lose Our Mindsout. de 2026We Found An Old Map Leading Us To Hotsprings...out. de 2026A Mysterious Presence on this Northern Islandset. de 2026Sailing Northern Canada | Alone and at Peaceset. de 2026

De Sailing Magic Carpet — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema