Sailing Squibvideo
Squib's Refit - Kitchen countertop - Diesel tank installation - Gas line bulkhead passage /114
April 10, 2025 · 17 min · 768 views
What this video covers
The refit of the vessel Squib involves structural modifications to the galley, fuel system, and interior framing. To ensure future access to the refrigerator, the galley countertop is secured with hidden fasteners rather than permanent epoxy, allowing for complete removal if the unit requires replacement. A custom trim strip is fitted to the countertop, shaped to match the hull curvature and bonded with a mixture of epoxy, Aerosil, and Iroko dust.
Work on the fuel system includes mounting the diesel tank on the port side, shifted from its original position to accommodate a reserve fuel canister and improve access to the filler neck. The installation requires drilling mounting holes while ensuring clearance from the rudder hardware. Additionally, a bulkhead penetration is installed for the gas line, positioned to maintain distance from the stove while navigating structural deck beams. Interior progress includes priming wooden components and installing plywood strips to the ceiling to support future insulation and paneling.
More from Sailing Squib
From Sailing Squib — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



