Sailing Squibvideo

Squib's Refit - Kitchen countertop - Diesel tank installation - Gas line bulkhead passage /114

10 April 2025 · 17 min · 768 views

What this video covers

The refit of the vessel Squib involves structural modifications to the galley, fuel system, and interior framing. To ensure future access to the refrigerator, the galley countertop is secured with hidden fasteners rather than permanent epoxy, allowing for complete removal if the unit requires replacement. A custom trim strip is fitted to the countertop, shaped to match the hull curvature and bonded with a mixture of epoxy, Aerosil, and Iroko dust.

Work on the fuel system includes mounting the diesel tank on the port side, shifted from its original position to accommodate a reserve fuel canister and improve access to the filler neck. The installation requires drilling mounting holes while ensuring clearance from the rudder hardware. Additionally, a bulkhead penetration is installed for the gas line, positioned to maintain distance from the stove while navigating structural deck beams. Interior progress includes priming wooden components and installing plywood strips to the ceiling to support future insulation and paneling.

Watch on YouTube

More from Sailing Squib

Sailing Squib May 2026 /2Aug 2026Sailing Squib - Contemporary WitnessJul 2026Sailing Squib - May 2026 /1Jul 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33Jun 2026

From Sailing Squib — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue