Leading the Escapadevideo

The Haul Out That Changed Everything...Ep 228!

June 24, 2026 · 16 min · 30K views · Panama

What this video covers

A haul-out at a boatyard — location not named in the video — covers several days of maintenance work on a catamaran. Pre-haul preparation includes closing seacocks, removing cushions, and securing the cats before pressure washing.3:49 The rudder is dropped on the trailer, requiring a seized pin to be worked loose.7:47 Hull polishing uses TotalBoat Total Buff, Total Shine, and wax applied in sequence; the crew skips wet sanding this time to preserve gel coat, accepting a slightly less white result than the previous haul-out.11:35 Tom grinds rust off the cast-iron keel and immediately applies TotalBoat epoxy barrier coat in gray over the keel and through-hulls, since cast iron oxidizes fast between grinding and coating.13:02 The outboard impeller on the dinghy had broken apart — pieces missing and chewed up — explaining erratic cooling despite water still appearing at the telltale; seized bolts had delayed the repair.15:19 A 5,000 BTU air conditioner is set up aboard while the boat sits on the hard.4:14 The next job involves either replacing through-hulls with a True Design setup or repairing cracks found in the rudder with epoxy and reglassing.15:37

Watch on YouTube

Featured in the fleet's guides

More from Leading the Escapade

We Ran Out of Fuel at Night… Then Got a Scary Warning ☠️ Ep-239Oct 2026Boat Repairs, Tropical Islands & One Last Bocas Adventure! Ep-239Sep 2026Sailing Panama…We Found a Secret Jungle River 🇵🇦 Ep-237Sep 2026Living the Dream in Bocas del Toro 🌴 Sailing, Tropical Paradise & StarfishSep 2026

From Leading the Escapade — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue