More
Language
Display mode
Leading the Escapadevideo
24 June 2026 · 16 min · 28K views · Panama
What this video covers
A haul-out at a boatyard — location not named in the footage — covers several days of maintenance work on a catamaran. Pre-haul preparation includes closing seacocks, removing cushions, and securing the cats before pressure washing.▶ 3:49 The rudder is dropped on the trailer, requiring a seized pin to be worked loose.▶ 7:31 Hull polishing uses TotalBoat Total Buff, Total Shine, and wax applied in sequence; the crew skips wet sanding this time to preserve gel coat, accepting a slightly less white result than the previous haul-out.▶ 10:19 Tom grinds rust off the cast-iron keel and immediately applies TotalBoat epoxy barrier coat in grey over the keel and through-hulls, since cast iron oxidises fast between grinding and coating.▶ 13:02 The outboard impeller on the dinghy had broken apart — pieces missing and chewed up — explaining erratic cooling despite water still appearing at the telltale; seized bolts had delayed the repair. A 5,000 BTU air conditioner is set up aboard while the boat sits on the hard.▶ 4:14 The next job involves either replacing through-hulls with a True Design setup or repairing cracks found in the rudder with epoxy and reglassing.▶ 15:37
More from Leading the Escapade
From Leading the Escapade — see the channel’s boat, crew, and every analysed video.