Sven Yrvindvideo

Getting boxes starting aft mast holder and trying dead pedal

December 13, 2025 · 5 min · 4K views · Mariestad

What this video covers

Sven Yrvind continues construction on his small, shallow-draft boat in Laxo, focusing on structural reinforcement and steering components.0:05 He fabricates a new axle from duplex alloy, noting its superior strength compared to 316 stainless steel.1:20 For lifting the vessel, he utilizes a 200-meter, 10-millimeter polyester line from Rødbryn, which has a breaking strength of 2.8 tons.2:14 Yrvind applies an eight-millimeter layer of epoxy to the hull, ensuring a watertight seal.3:00 He installs the aft mast holder by roughening the contact surfaces and securing it against the transom, with plans to reinforce the assembly with fiberglass.3:57 Additionally, he modifies the steering system by grinding the plywood hockey sticks and adjusting the position of the dead pedal to improve ergonomics.5:01 He prepares to install the door, which requires removing the mattress to clear the workspace.5:14 These modifications prioritize structural integrity and mechanical reliability for his planned voyage to New Zealand.

Watch on YouTube

More from Sven Yrvind

Aft Sail Up.Sep 2026Two Sails Up.Sep 2026The Boat Is Out of the Workshop.Aug 2026Ready for Masts and Sails.Aug 2026

From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue