Sven Yrvindvideo
Getting boxes starting aft mast holder and trying dead pedal
December 13, 2025 · 5 min · 4K views · Mariestad
What this video covers
Sven Yrvind continues construction on his small, shallow-draft boat in Laxo, focusing on structural reinforcement and steering components.0:05 He fabricates a new axle from duplex alloy, noting its superior strength compared to 316 stainless steel.1:20 For lifting the vessel, he utilizes a 200-meter, 10-millimeter polyester line from Rødbryn, which has a breaking strength of 2.8 tons.2:14 Yrvind applies an eight-millimeter layer of epoxy to the hull, ensuring a watertight seal.3:00 He installs the aft mast holder by roughening the contact surfaces and securing it against the transom, with plans to reinforce the assembly with fiberglass.3:57 Additionally, he modifies the steering system by grinding the plywood hockey sticks and adjusting the position of the dead pedal to improve ergonomics.5:01 He prepares to install the door, which requires removing the mattress to clear the workspace.5:14 These modifications prioritize structural integrity and mechanical reliability for his planned voyage to New Zealand.
More from Sven Yrvind
From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



