VOILIER ODINβίντεο

PREPARATION AND TUNING

24 Δεκεμβρίου 2023 · 22 λεπτά · 5K προβολές

Τι καλύπτει αυτό το βίντεο

A boat owner fabricates and installs custom steel engine mounts to accommodate a new, more compact engine. Because the existing engine bed is not square, the builder constructs adjustable steel brackets using flat bar cut and welded to match the specific, non-90-degree angle of the hull supports. After pre-drilling 3mm pilot holes, the builder mounts the 300kg engine to verify alignment with the propeller shaft and the cutlass bearing.8:23 Once the fit is confirmed, the mounts are removed for surface preparation, including cleaning with acetone and applying a rust-inhibitor (Ferose). Due to low ambient temperatures, the builder moves the painting process inside the boat, using a 2000-watt heater to maintain a temperature suitable for applying three coats of paint.12:42 The project concludes with the cleaning of the original Vetus stuffing box, which the builder prefers over modern mechanical seals for its reliability and ease of maintenance. The final steps involve cutting the propeller shaft to the required 1.20-meter length and installing the stuffing box with new packing.

Παρακολουθήστε στο YouTube

Σκάφη σε αυτό το βίντεο

Etap 38iΤο σκάφος τους

Περισσότερα από το VOILIER ODIN

SAILING ATYPIC AT THE PAVOIS IN LA ROCHELLEΟκτ 2026Sailing under asymmetric spinnaker with a Sun OdysseyΑυγ 2026TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATIONΑυγ 2026WHY I'M MOVING BACK TO FRANCEΙουλ 2026

Από VOILIER ODIN — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος