VOILIER ODINvídeo

PREPARATION AND TUNING

24 de dezembro de 2023 · 22 min · 5K visualizações

O que este vídeo aborda

A boat owner fabricates and installs custom steel engine mounts to accommodate a new, more compact engine. Because the existing engine bed is not square, the builder constructs adjustable steel brackets using flat bar cut and welded to match the specific, non-90-degree angle of the hull supports. After pre-drilling 3mm pilot holes, the builder mounts the 300kg engine to verify alignment with the propeller shaft and the cutlass bearing.8:23 Once the fit is confirmed, the mounts are removed for surface preparation, including cleaning with acetone and applying a rust-inhibitor (Ferose). Due to low ambient temperatures, the builder moves the painting process inside the boat, using a 2000-watt heater to maintain a temperature suitable for applying three coats of paint.12:42 The project concludes with the cleaning of the original Vetus stuffing box, which the builder prefers over modern mechanical seals for its reliability and ease of maintenance. The final steps involve cutting the propeller shaft to the required 1.20-meter length and installing the stuffing box with new packing.

Ver no YouTube

Barcos neste vídeo

Etap 38iO barco deles

Mais de VOILIER ODIN

SAILING ATYPIC AT THE PAVOIS IN LA ROCHELLE10/2026Sailing under asymmetric spinnaker with a Sun Odyssey08/2026TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATION08/2026WHY I'M MOVING BACK TO FRANCE07/2026

De VOILIER ODIN — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema