VOILIER ODINvideo

PREPARATION AND TUNING

24. desember 2023 · 22 min · 5K visninger

Hva denne videoen dekker

A boat owner fabricates and installs custom steel engine mounts to accommodate a new, more compact engine. Because the existing engine bed is not square, the builder constructs adjustable steel brackets using flat bar cut and welded to match the specific, non-90-degree angle of the hull supports. After pre-drilling 3mm pilot holes, the builder mounts the 300kg engine to verify alignment with the propeller shaft and the cutlass bearing.8:23 Once the fit is confirmed, the mounts are removed for surface preparation, including cleaning with acetone and applying a rust-inhibitor (Ferose). Due to low ambient temperatures, the builder moves the painting process inside the boat, using a 2000-watt heater to maintain a temperature suitable for applying three coats of paint.12:42 The project concludes with the cleaning of the original Vetus stuffing box, which the builder prefers over modern mechanical seals for its reliability and ease of maintenance. The final steps involve cutting the propeller shaft to the required 1.20-meter length and installing the stuffing box with new packing.

Se på YouTube

Båter i denne videoen

Etap 38iDeres båt

Mer fra VOILIER ODIN

SAILING ATYPIC AT THE PAVOIS IN LA ROCHELLEokt. 2026Sailing under asymmetric spinnaker with a Sun Odysseyaug. 2026TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATIONaug. 2026WHY I'M MOVING BACK TO FRANCEjuli 2026

Fra VOILIER ODIN – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem