VOILIER ODINvidéo

PREPARATION AND TUNING

24 décembre 2023 · 22 min · 5K vues

Ce que couvre cette vidéo

A boat owner fabricates and installs custom steel engine mounts to accommodate a new, more compact engine. Because the existing engine bed is not square, the builder constructs adjustable steel brackets using flat bar cut and welded to match the specific, non-90-degree angle of the hull supports. After pre-drilling 3mm pilot holes, the builder mounts the 300kg engine to verify alignment with the propeller shaft and the cutlass bearing.8:23 Once the fit is confirmed, the mounts are removed for surface preparation, including cleaning with acetone and applying a rust-inhibitor (Ferose). Due to low ambient temperatures, the builder moves the painting process inside the boat, using a 2000-watt heater to maintain a temperature suitable for applying three coats of paint.12:42 The project concludes with the cleaning of the original Vetus stuffing box, which the builder prefers over modern mechanical seals for its reliability and ease of maintenance. The final steps involve cutting the propeller shaft to the required 1.20-meter length and installing the stuffing box with new packing.

Regarder sur YouTube

Bateaux dans cette vidéo

Etap 38iLeur bateau

Plus de vidéos de VOILIER ODIN

SAILING ATYPIC AT THE PAVOIS IN LA ROCHELLEoct. 2026Sailing under asymmetric spinnaker with a Sun Odysseyaoût 2026TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATIONaoût 2026WHY I'M MOVING BACK TO FRANCEjuil. 2026

De VOILIER ODIN — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème