VOILIER ODINvídeo
PREPARATION AND TUNING
24 de diciembre de 2023 · 22 min · 5K visitas
Qué cubre este vídeo
A boat owner fabricates and installs custom steel engine mounts to accommodate a new, more compact engine. Because the existing engine bed is not square, the builder constructs adjustable steel brackets using flat bar cut and welded to match the specific, non-90-degree angle of the hull supports. After pre-drilling 3mm pilot holes, the builder mounts the 300kg engine to verify alignment with the propeller shaft and the cutlass bearing.8:23 Once the fit is confirmed, the mounts are removed for surface preparation, including cleaning with acetone and applying a rust-inhibitor (Ferose). Due to low ambient temperatures, the builder moves the painting process inside the boat, using a 2000-watt heater to maintain a temperature suitable for applying three coats of paint.12:42 The project concludes with the cleaning of the original Vetus stuffing box, which the builder prefers over modern mechanical seals for its reliability and ease of maintenance. The final steps involve cutting the propeller shaft to the required 1.20-meter length and installing the stuffing box with new packing.
Barcos en este vídeo
Más de VOILIER ODIN
De VOILIER ODIN — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.