VOILIER ODINvideo

PREPARATION AND TUNING

24 dicembre 2023 · 22 min · 5K visualizzazioni

Cosa tratta questo video

A boat owner fabricates and installs custom steel engine mounts to accommodate a new, more compact engine. Because the existing engine bed is not square, the builder constructs adjustable steel brackets using flat bar cut and welded to match the specific, non-90-degree angle of the hull supports. After pre-drilling 3mm pilot holes, the builder mounts the 300kg engine to verify alignment with the propeller shaft and the cutlass bearing.8:23 Once the fit is confirmed, the mounts are removed for surface preparation, including cleaning with acetone and applying a rust-inhibitor (Ferose). Due to low ambient temperatures, the builder moves the painting process inside the boat, using a 2000-watt heater to maintain a temperature suitable for applying three coats of paint.12:42 The project concludes with the cleaning of the original Vetus stuffing box, which the builder prefers over modern mechanical seals for its reliability and ease of maintenance. The final steps involve cutting the propeller shaft to the required 1.20-meter length and installing the stuffing box with new packing.

Guarda su YouTube

Barche in questo video

Etap 38iLa loro barca

Altro da VOILIER ODIN

SAILING ATYPIC AT THE PAVOIS IN LA ROCHELLEott 2026Sailing under asymmetric spinnaker with a Sun Odysseyago 2026TOP NAVIGATION - WORTH REPEATING WITHOUT HESITATIONago 2026WHY I'M MOVING BACK TO FRANCElug 2026

Da VOILIER ODIN — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema