Sailing SV Delosvideo
FINAL PUSH: Offshore or Bust! Sailing Vessel Delos Ep. 515
18 July 2025 · 30 min · 274K views
What this video covers
The crew of SV Delos prepares for a long passage by performing a comprehensive rig inspection and upgrading the vessel's electrical system. The host climbs the main mast to check fittings, swages, and pins for cracks, corrosion, or missing hardware, noting that the rig was last replaced in Thailand nine years ago. To resolve long-term battery capacity issues caused by cell imbalance in a 24-volt series configuration, the crew installs eight new Battle Born smart lithium iron phosphate batteries. The installation includes a Bluetooth-enabled hub that allows individual monitoring of each battery's voltage, temperature, and state of charge. Before finalizing the series connections, the host balances the batteries by charging each unit individually to full capacity. The crew also completes a 60-day provisioning run and addresses minor maintenance tasks, including clearing a blocked drain in the rain catchment system. After casting off from the dock, the vessel moves to a nearby anchorage to begin the passage. Balancing batteries individually before connecting them in series prevents cell degradation and ensures a healthier, longer-lasting electrical bank.
More from Sailing SV Delos
From Sailing SV Delos — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



