Gone with the Wynnsvideo
Testing Our New Electric Tender⚡(boat build update)
17 December 2023 · 25 min · 282K views · Xiamen
What this video covers
Construction of an HH 44 catamaran continues at the factory, with the vessel receiving its third coat of copper bottom paint and newly installed rope cutters.1:12 The owners successfully integrated a top-loading dishwasher into the galley, a custom modification that required a variation order due to the original cabinet dimensions.7:05 The unit holds approximately eight plates and features a sanitation mode for produce.4:16 Additionally, the owners conducted a sea trial of their new electric-powered rigid tender, testing battery capacity and propulsion performance in a local pond.12:36 The tender utilises an electric jet drive, which the owners selected for its longevity and performance characteristics.10:13 Elsewhere in the build, the mast installation was verified for fit, and interior and exterior cushions were fitted to the vessel.22:17 The owners plan to monitor the electric tender’s performance over the next year to evaluate the reliability of the propulsion system.10:57
Boats in this video
More from Gone with the Wynns
From Gone with the Wynns — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



