Sail Lifevideo

The road back to boat work: Floors, paint, and tool trailer Ep. 687

19 July 2026 · 21 min · 67K views

What this video covers

Mads and Ava prepare their property for the arrival of Spiffy, their 44-foot hurricane-damaged catamaran, by establishing a dedicated workshop and pouring foundations for two shipping containers.0:25 A structural engineer provided footer calculations based on local soil conditions to support the containers.6:22 While awaiting the boat's arrival, the crew focuses on home renovations, including installing 400 square feet of reclaimed oak flooring.2:33 They upgraded two planers—a DeWalt 734 and a 735—with carbide helical cutting heads to process the hardwood, noting that the 735 upgrade was more straightforward than the 734.11:02 The team also assembled two workshop tables using frames from Rockler.com and installed a Reolink security camera system.8:42 Future plans include using a newly delivered laser welder and CNC machine for stainless steel grab rails and aluminium water tanks for the catamaran.14:30 The crew continues to manage site logistics, including the removal of an electrical pole and scheduling excavation for the container foundations.0:42

Watch on YouTube

Boats in this video

Antares Yachts 44Their boat

More from Sail Life

The road back to boat work: The square eagle has landed! Ep. 695Sept 2026The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694Sept 2026Can I build an aluminum fuel tank with the xTool MetalFab laser welder and CNC? Ep. 693Aug 2026The road back to boat work: shipping delays, site prep and bending metal with a 3D print Ep. 692Aug 2026

From Sail Life — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue