YACHTING STEADFASTvideo
PITCHING THE BILGE PART II Sealing the bow of a wooden sailing vessel by filling the bilge pockets.
14 August 2026 · 3 min · 3 views · Cambridge, Maryland
What this video covers
Steven Uhthoff fills non-draining bilge pockets in the bow of a 1934 William Hand–designed ketch with number three asphalt (low-odor) as part of a major bow repair underway in Cambridge, Maryland since August 2024.0:05 The repair replaced a rotted oak stem and knee with purpleheart, and re-planking and re-caulking of the majority of the hull are ongoing.1:23 Pouring hot asphalt — heated to roughly 400 degrees Fahrenheit using a large propane burner to melt blocks of the material — seals the new construction in areas of the bilge that cannot drain.2:28 A smaller burner cuts portions off the solid blocks before melting.2:41 The product is inexpensive and available in block form; the crew improvised melting vessels from a sacrificed teapot and pots sourced at a local Goodwill.2:56 Uhthoff notes that finding any prior documentation on this specific technique — filling non-draining bow bilge pockets with asphalt on a wooden vessel — proved difficult, which motivated sharing the process.0:05 Hot asphalt poured while still fluid flows into tight spaces between new frames and planking, sealing them completely once cooled.0:19
More from YACHTING STEADFAST
From YACHTING STEADFAST — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



