Sailing Catalpavideo

Sailing the World: Why you need one of these | Ep 395

18 February 2024 · 17 min · 14K views

What this video covers

The crew of Catalpa performs three maintenance tasks: installing a Mantus swivel, repairing a soft spot in the deck, and rewiring navigation lights. To prevent anchor loss from side-loading in squalls, the crew replaces a standard shackle and traditional swivel with a Mantus swivel, which maintains a straight load on the anchor regardless of boat orientation.11:48 For the deck repair, the crew removes a section of the fibreglass headliner in the bathroom to access a soft spot in the deck core.5:17 After excavating the rotted core, they fill the void with thickened epoxy and glass over the area.10:40 Finally, the crew replaces corroded external wiring for the Aqua Signal navigation lights by running new cables through internal conduits to eliminate exposed joints.11:48 They solder the connections to the light fixtures to ensure a watertight seal and plan to upgrade the incandescent bulbs to LEDs later.15:45 Proper cable routing and eliminating external junctions prevent salt-water corrosion in marine electrical systems.

Watch on YouTube

More from Sailing Catalpa

arriving to the most remote atolls on earth...the TuamotusSept 2026they weren't expecting thisSept 2026one of the most remote islands on the planetSept 202629 days sailing Panama to French Polynesia the whole passageAug 2026

From Sailing Catalpa — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue