Sail Lifevideo

Sail Life - Rewiring the AC, source select panel and insulating the aft cabin - DIY sailboat refit

14 May 2017 · 23 min · 65K views · Denmark

What this video covers

Mads completes the AC electrical installation aboard his sailboat, Athena, by mounting a Blue Sea Systems source select panel and a separate meter box near the shore power inlet.3:20 He wires the panel for shore power, noting the use of specific terminals that comply with ABYC standards, and prepares the system for a final inspection by a professional electrician.6:08 Beyond the electrical work, he begins insulating the aft cabin hull and fabricating wooden mounting panels for terminal blocks using 12mm plywood, epoxy, and fiberglass.10:49 He plans to cover the hull with 148 meters of mahogany slats to finish the cabin interior.11:35 Additionally, he evaluates the installation of six new, larger CE-approved port lights to replace the existing leaky units.19:59 He discovers a potential compatibility issue, as the curvature of the hull exceeds the manufacturer's specifications for the new port lights.22:12

Watch on YouTube

Boats in this video

Antares Yachts 44Their boat

More from Sail Life

The road back to boat work: A bunker surprise. Ep. 698Oct 2026BUNKER vs. LASER - xTool MetalFab laser welder and CNC Ep. 697Sept 2026The road back to boat work: Bunker Makeover! Ep. 696Sept 2026The road back to boat work: The square eagle has landed! Ep. 695Sept 2026

From Sail Life — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue