Wildling Sailingvideo

I’m Just Days Away From DIY Rigging My Huge Catamaran!

5 July 2024 · 23 min · 92K views · The Netherlands

What this video covers

A 42-foot catamaran undergoes a DIY re-rigging process using Dyneema line to replace traditional stainless steel wire.0:30 The project involves measuring and splicing stays, including cap shrouds, intermediate shrouds, and forestay bridles.11:20 To ensure accuracy, each stay is measured against technical drawings, then stretched between dock bollards using a ratchet strap to account for material elongation before final installation.10:35 The host calculates stay lengths by subtracting the dimensions of shackles, thimbles, and lanyards, intentionally cutting the Dyneema slightly short to compensate for expected stretch.9:19 The mast step requires custom-fabricated wedge washers to accommodate a three-degree angle, which are epoxy-coated and sealed with Sikaflex.1:05 Additionally, the anchor locker is reorganized by reducing the anchor chain length from 58 meters to approximately 30 meters to decrease bow weight, while switching from a heavy fisherman’s anchor to a CQR.18:19 The project concludes with preparations to step the mast, with the host noting that Dyneema offers significant weight savings over stainless steel at a comparable cost.14:47 Careful measurement and iterative testing are essential to ensure the structural integrity of DIY standing rigging.

Watch on YouTube

More from Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran RefitOct 2026I Lifted Her Out For a Very Important Rebuild.Sept 2026One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026

From Wildling Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue