More
Language
Display mode
Sven Yrvindvideo
8 April 2026 · 3 min · 2K views
What this video covers
Sven Yrvind installs a three-fuse electrical distribution system for his boat’s solar power setup.▶ 1:06 He consults with a professional electric car mechanic to determine the proper placement and configuration of fuses for the solar regulator, battery, and lighting circuits.▶ 0:24 The system includes dedicated fuses for the fan, computer, and AIS unit.▶ 0:59 Yrvind mounts the fuse block on a 35-millimetre-high duvinocell spacer to ensure clearance from the bulkhead wall.▶ 1:29 Inside the boat, he routes the electrical cables near the mast holder on the starboard side, replacing existing bulkhead penetrations with new white-coloured fittings to improve the installation.▶ 2:00 The project focuses on organising the wiring path from the solar regulator to the battery and auxiliary components to ensure reliable power distribution.
More from Sven Yrvind
From Sven Yrvind — see the channel’s boat, crew, and every analysed video.