BoatworksTodayvideo

STARTING THE COOSA TRANSOM ON THE BERTRAM 25!

31 January 2021 · 16 min · 51K views

What this video covers

Andy rebuilds the transom of a Bertram 25 by installing Coosa Blue Water 26 fiberglass-reinforced foam panels.2:01 After prepping the transom area, he cuts a one-inch thick panel to fit the recessed section, using a jigsaw equipped with a carbide-tipped blade to prevent premature wear from the fiberglass strands.2:50 To ensure a precise fit, he cuts the panel slightly smaller than the template.4:22 When determining the thickness for subsequent layers, he compares one-inch and half-inch panels to achieve a flush fit against the existing transom contours.8:17 He selects the half-inch material to maintain better surface contact and avoid excessive grinding, then uses a router with a carbide-tipped flush trim bit to create an exact copy of the first panel.9:53 Before final installation, he fills low spots and imperfections on the transom surface using Total Fair epoxy filler to ensure a strong bond with the new coring.13:34

Watch on YouTube

More from BoatworksToday

Why Is My 920Ah Sailboat Battery Bank So Big FOR THIS TINY SAILBOAT?? This Is Why ;-)!Oct 2026New Epoch Batteries Just Landed for My Victron System But It's On Hold For Annapolis Boat Show Prep!Sept 2026I Was Wrong About My Boat's Victron Wiring (You Were Right!)Sept 2026Will This Entire Victron Electrical System Fit In My Little Boat?Aug 2026

From BoatworksToday — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue