Entre Terras e Maresvideo

90% of the STRUCTURE is READY S1.ep 183

26 July 2026 · 30 min · 259 views

What this video covers

Edgar and Sâmia make progress on the interior cabinetry and storage layout for their boat, focusing on the port-side structure. The build involves creating custom storage compartments for sails—including a genoa, code zero, and symmetric spinnaker—alongside a dedicated broom closet and a utility area for windlass batteries.9:52 To determine the precise curvature of the hull for the cabinetry, Edgar uses a template system made of small wooden sticks, which he later cleans and reuses.3:17 The construction process requires multiple dry-fit sessions to ensure proper alignment and perpendicularity before final lamination with epoxy and polyester resin.14:58 Challenges include limited workspace, poor lighting, and the need to adjust structural pieces that shifted during the initial assembly.14:32 Edgar cuts the cabinet doors from plywood to protect the material from rain, though some pieces require further trimming for a flush fit.22:29 The final layout includes fixed shelves and modular storage sections designed to maximise interior volume.28:12

Watch on YouTube

More from Entre Terras e Mares

WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep180May 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue