Entre Terras e Maresvideo
90% of the STRUCTURE is READY S1.ep 183
26 July 2026 · 30 min · 177 views
What this video covers
Edgar and Sâmia make progress on the interior cabinetry and storage layout for their boat, focusing on the port-side structure.▶ 18:40 The build involves creating custom storage compartments for sails—including a genoa, code zero, and symmetric spinnaker—alongside a dedicated broom closet and a utility area for windlass batteries.▶ 9:52 To determine the precise curvature of the hull for the cabinetry, Edgar uses a template system made of small wooden sticks, which he later cleans and reuses.▶ 3:18 The construction process requires multiple dry-fit sessions to ensure proper alignment and perpendicularity before final lamination with epoxy and polyester resin.▶ 14:58 Challenges include limited workspace, poor lighting, and the need to adjust structural pieces that shifted during the initial assembly.▶ 18:40 Edgar cuts the cabinet doors from plywood to protect the material from rain, though some pieces require further trimming for a flush fit.▶ 22:35 The final layout includes fixed shelves and modular storage sections designed to maximise interior volume.▶ 27:37
More from Entre Terras e Mares
From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



