Tips from a Shipwrightvideo

Building the TotalBoat work skiff - The Guards (Episode 29)

24 February 2017 · 11 min · 315K views

What this video covers

Louis Sauzedde continues construction on a TotalBoat work skiff, focusing on fastening bottom planks to runners and installing chamfered guards.8:35 To secure the bottom planks, he drives square-cut nails using a pin maul, alternating between nails and boards to prevent the wood from popping up and to ensure a tight fit against the runners.3:24 He emphasizes keeping the hammer handle low to the floor to avoid bending the nails and uses the hammer’s weight to drive the heads flush below the surface without dimpling the wood.3:56 For the guards, he cuts a 45-degree chamfer along the bottom edge using a circular saw, clamping the wood to sawhorses to prevent sliding during the cut.9:01 The project remains in progress, with upcoming tasks including installing cap rails, mounting a knee in front of the outboard motor, and bolting the transom corner posts.0:50 The builder plans to finish the guards and rails with oil to highlight the wood grain.1:35

Watch on YouTube

More from Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEMar 2026Progressive BevelingFeb 20261958 Harley Davidson Panhead Motorcycle - For SaleFeb 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale LinesJan 2026

From Tips from a Shipwright — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue