Hold Fast!vídeo

S/V SeaSprite Refit Update 18-20 Sep 2026

20 de setembro de 2026 · 4 min · 1K visualizações · Phipps Footworks

O que este vídeo aborda

Refinishing the teak on the S/V SeaSprite involves stripping and sanding the cockpit coaming boards, the eyebrow, and the toe rail.0:35 After initial sanding with 120-grit paper, the coaming boards required an 80-grit pass to remove remaining varnish before finishing with 120-grit.2:46 The cockpit cubbies and radiuses were sanded by hand.3:04 The project includes installing midship cleats into the toe rail to improve spring line handling, addressing a design oversight that previously forced the use of shrouds or cockpit winches for mooring.1:36 The mast and boom were moved to the Phipps Footworks shed for painting.2:17 Additional upgrades include replacing old plastic cockpit drains with new bronze units from Spartan and installing mid-rail chocks.4:31 Old adhesive sealant was removed from the starboard side coaming area in preparation for final cleaning with acetone and subsequent varnishing.4:05

Ver no YouTube

Barcos neste vídeo

Sea SPRITE 30O barco delesCabo RICO 38O barco delesCabo RICO 56O barco deles

Mais de Hold Fast!

S/V SeaSprite Refit Update 9 September 202609/2026S/V SeaSprite Refit Update 8 September 202609/2026S/V SeaSprite Refit Update - 4 Sep 202609/2026S/V SeaSprite Refit Update - 19 August 202608/2026

De Hold Fast! — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema