Hold Fast!vidéo

S/V SeaSprite Refit Update 18-20 Sep 2026

20 septembre 2026 · 4 min · 1K vues · Phipps Footworks

Ce que couvre cette vidéo

Refinishing the teak on the S/V SeaSprite involves stripping and sanding the cockpit coaming boards, the eyebrow, and the toe rail.0:35 After initial sanding with 120-grit paper, the coaming boards required an 80-grit pass to remove remaining varnish before finishing with 120-grit.2:46 The cockpit cubbies and radiuses were sanded by hand.3:04 The project includes installing midship cleats into the toe rail to improve spring line handling, addressing a design oversight that previously forced the use of shrouds or cockpit winches for mooring.1:36 The mast and boom were moved to the Phipps Footworks shed for painting.2:17 Additional upgrades include replacing old plastic cockpit drains with new bronze units from Spartan and installing mid-rail chocks.4:31 Old adhesive sealant was removed from the starboard side coaming area in preparation for final cleaning with acetone and subsequent varnishing.4:05

Regarder sur YouTube

Bateaux dans cette vidéo

Sea SPRITE 30Leur bateauCabo RICO 38Leur bateauCabo RICO 56Leur bateau

Plus de vidéos de Hold Fast!

S/V SeaSprite Refit Update 9 September 2026sept. 2026S/V SeaSprite Refit Update 8 September 2026sept. 2026S/V SeaSprite Refit Update - 4 Sep 2026sept. 2026S/V SeaSprite Refit Update - 19 August 2026août 2026

De Hold Fast! — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème