Sam Holmes Sailingvídeo

Workshop update 3

7 de marzo de 2021 · 11 min · 45K visitas

Qué cubre este vídeo

Renovating a workshop involves clearing debris, installing infrastructure, and managing pests. The cleanup process includes removing multiple toilets, hauling away scrap metal, and organizing lumber salvaged from a deck.0:36 Electrical upgrades feature 8-foot T8 LED tube lights, which require removing the ballast to eliminate flickering and buzzing.1:20 Security is managed by a four-camera wired system with night vision.2:16 An outdoor shower setup utilizes a tankless water heater, while a 150-gallon tub serves as a makeshift hot tub, with water recirculated through a pump and pressure washer filter.4:25 Pests in the attic are addressed with traps and a security camera, while a 3D-printed urine diverter is fabricated for a composting toilet.3:09 Additional shop improvements include installing a garage door, securing certified argon and oxy-acetylene tanks for welding, and creating attic access for storage.10:21 A heated mattress pad provides warmth in the unheated space, and a light bulb inside a box creates a localized warm environment for temperature-sensitive items.8:16

Ver en YouTube

Más de Sam Holmes Sailing

We hit a log sailing by strange Indonesian sea platformsago 2026Replacing a window while sailing through pirate waters and wildlife of Borneoago 2026Sandakan and Wildlife of Borneoago 2026Kota Kinabalu Bound: Sailing, Survivor Island, Squalls, and Bugs, 3d printingjul 2026

De Sam Holmes Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema