Sam Holmes Sailingvideo
Workshop update 3
7 marzo 2021 · 11 min · 45K visualizzazioni
Cosa tratta questo video
Renovating a workshop involves clearing debris, installing infrastructure, and managing pests. The cleanup process includes removing multiple toilets, hauling away scrap metal, and organizing lumber salvaged from a deck.0:36 Electrical upgrades feature 8-foot T8 LED tube lights, which require removing the ballast to eliminate flickering and buzzing.1:20 Security is managed by a four-camera wired system with night vision.2:16 An outdoor shower setup utilizes a tankless water heater, while a 150-gallon tub serves as a makeshift hot tub, with water recirculated through a pump and pressure washer filter.4:25 Pests in the attic are addressed with traps and a security camera, while a 3D-printed urine diverter is fabricated for a composting toilet.3:09 Additional shop improvements include installing a garage door, securing certified argon and oxy-acetylene tanks for welding, and creating attic access for storage.10:21 A heated mattress pad provides warmth in the unheated space, and a light bulb inside a box creates a localized warm environment for temperature-sensitive items.8:16
Altro da Sam Holmes Sailing
Da Sam Holmes Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



