Sam Holmes Sailingvídeo
Workshop update 3
7 de março de 2021 · 11 min · 45K visualizações
O que este vídeo aborda
Renovating a workshop involves clearing debris, installing infrastructure, and managing pests. The cleanup process includes removing multiple toilets, hauling away scrap metal, and organizing lumber salvaged from a deck.0:36 Electrical upgrades feature 8-foot T8 LED tube lights, which require removing the ballast to eliminate flickering and buzzing.1:20 Security is managed by a four-camera wired system with night vision.2:16 An outdoor shower setup utilizes a tankless water heater, while a 150-gallon tub serves as a makeshift hot tub, with water recirculated through a pump and pressure washer filter.4:25 Pests in the attic are addressed with traps and a security camera, while a 3D-printed urine diverter is fabricated for a composting toilet.3:09 Additional shop improvements include installing a garage door, securing certified argon and oxy-acetylene tanks for welding, and creating attic access for storage.10:21 A heated mattress pad provides warmth in the unheated space, and a light bulb inside a box creates a localized warm environment for temperature-sensitive items.8:16
Mais de Sam Holmes Sailing
De Sam Holmes Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



