Sam Holmes Sailingvidéo
Workshop update 3
7 mars 2021 · 11 min · 45K vues
Ce que couvre cette vidéo
Renovating a workshop involves clearing debris, installing infrastructure, and managing pests. The cleanup process includes removing multiple toilets, hauling away scrap metal, and organizing lumber salvaged from a deck.0:36 Electrical upgrades feature 8-foot T8 LED tube lights, which require removing the ballast to eliminate flickering and buzzing.1:20 Security is managed by a four-camera wired system with night vision.2:16 An outdoor shower setup utilizes a tankless water heater, while a 150-gallon tub serves as a makeshift hot tub, with water recirculated through a pump and pressure washer filter.4:25 Pests in the attic are addressed with traps and a security camera, while a 3D-printed urine diverter is fabricated for a composting toilet.3:09 Additional shop improvements include installing a garage door, securing certified argon and oxy-acetylene tanks for welding, and creating attic access for storage.10:21 A heated mattress pad provides warmth in the unheated space, and a light bulb inside a box creates a localized warm environment for temperature-sensitive items.8:16
Plus de vidéos de Sam Holmes Sailing
De Sam Holmes Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



