Sam Holmes Sailingvídeo

Workshop update 3

7 de março de 2021 · 11 min · 45K visualizações

O que este vídeo aborda

Renovating a workshop involves clearing debris, installing infrastructure, and managing pests. The cleanup process includes removing multiple toilets, hauling away scrap metal, and organizing lumber salvaged from a deck.0:36 Electrical upgrades feature 8-foot T8 LED tube lights, which require removing the ballast to eliminate flickering and buzzing.1:20 Security is managed by a four-camera wired system with night vision.2:16 An outdoor shower setup utilizes a tankless water heater, while a 150-gallon tub serves as a makeshift hot tub, with water recirculated through a pump and pressure washer filter.4:25 Pests in the attic are addressed with traps and a security camera, while a 3D-printed urine diverter is fabricated for a composting toilet.3:09 Additional shop improvements include installing a garage door, securing certified argon and oxy-acetylene tanks for welding, and creating attic access for storage.10:21 A heated mattress pad provides warmth in the unheated space, and a light bulb inside a box creates a localized warm environment for temperature-sensitive items.8:16

Assistir no YouTube

Mais de Sam Holmes Sailing

We hit a log sailing by strange Indonesian sea platformsago. de 2026Replacing a window while sailing through pirate waters and wildlife of Borneoago. de 2026Sandakan and Wildlife of Borneoago. de 2026Kota Kinabalu Bound: Sailing, Survivor Island, Squalls, and Bugs, 3d printingjul. de 2026

De Sam Holmes Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema