Sam Holmes Sailingvideo

Workshop update 3

7 de marzo de 2021 · 11 min · 45K vistas

¿Qué cubre este video?

Renovating a workshop involves clearing debris, installing infrastructure, and managing pests. The cleanup process includes removing multiple toilets, hauling away scrap metal, and organizing lumber salvaged from a deck.0:36 Electrical upgrades feature 8-foot T8 LED tube lights, which require removing the ballast to eliminate flickering and buzzing.1:20 Security is managed by a four-camera wired system with night vision.2:16 An outdoor shower setup utilizes a tankless water heater, while a 150-gallon tub serves as a makeshift hot tub, with water recirculated through a pump and pressure washer filter.4:25 Pests in the attic are addressed with traps and a security camera, while a 3D-printed urine diverter is fabricated for a composting toilet.3:09 Additional shop improvements include installing a garage door, securing certified argon and oxy-acetylene tanks for welding, and creating attic access for storage.10:21 A heated mattress pad provides warmth in the unheated space, and a light bulb inside a box creates a localized warm environment for temperature-sensitive items.8:16

Ver en YouTube

Más de Sam Holmes Sailing

Hundreds of miles of rough sailing only to be turned away from our dream destinationoct 2026Making big miles offshore sailing through Indonesiasep 2026Orca sighting! we repair one daggerboard only to break another onesep 2026Sailing to Maratua, a rarely visited Indonesian island sep 2026

De Sam Holmes Sailing — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema