Sven Yrvindvidéo

2 Masts down, ready for the trailer.

8 septembre 2026 · 2 min · 5K vues

Ce que couvre cette vidéo

Sven Yrvind prepares his boat for transport by lowering the two foremasts and the boom.0:53 He secures the spars using knots and black lifting ropes to ensure they remain stationary during transit.1:03 The boom requires additional clearance and a secondary knob to improve stability, though he prioritizes launching the boat over making these mechanical refinements.0:14 He removes the wheels and adjusts the screws to finalize the configuration for the trailer.1:55 The process highlights the iterative nature of boat rigging, where initial tolerances often require adjustment after the first assembly.

Regarder sur YouTube

Plus de vidéos de Sven Yrvind

Back to Work.sept. 2026A Non Bloated Boat in a Bloated World.sept. 2026No access to boat sat and sunday.sept. 2026Fixing water collection and trailer adaption.sept. 2026

De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème