Entre Terras e Maresvideo

WE FINALLY COMPLETED the installation of the PROPELLER SHAFT AND CV JOINT for the T1 boat.ep166

15 febbraio 2026 · 28 min · 481 visualizzazioni

Cosa tratta questo video

Edgar installs the propeller shaft and constant velocity (CV) joint on his boat, completing a long-term mechanical project. He begins by inserting the shaft into the hull tunnel from the outside, ensuring the propeller and zinc anode are correctly positioned.0:03 To secure the internal shaft bearing, he fabricates a custom stainless steel support, which he cuts to shape and welds before laminating it directly into the hull structure.7:48 He uses a mixture of polyester resin, fiber powder, and Aerosil to bond the bearing flange to the hull, allowing the resin to flow through pre-drilled holes to lock the piece in place.8:52 After aligning the shaft and CV joint, he applies high-torque thread locker to the fasteners.10:55 Although the assembly is currently functional, he plans to disassemble the CV joint later to install the water seal and final cotter pins.21:19 The process confirms that precise alignment and structural lamination are essential for mounting a shaft system within a solid hull section.16:13

Guarda su YouTube

Altro da Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183lug 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182giu 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181giu 2026This week the focus was on something elsegiu 2026

Da Entre Terras e Mares — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema