Entre Terras e Maresvideo
WE FINALLY COMPLETED the installation of the PROPELLER SHAFT AND CV JOINT for the T1 boat.ep166
15 February 2026 · 28 min · 481 views
What this video covers
Edgar installs the propeller shaft and constant velocity (CV) joint on his boat, completing a long-term mechanical project. He begins by inserting the shaft into the hull tunnel from the outside, ensuring the propeller and zinc anode are correctly positioned.0:03 To secure the internal shaft bearing, he fabricates a custom stainless steel support, which he cuts to shape and welds before laminating it directly into the hull structure.7:48 He uses a mixture of polyester resin, fiber powder, and Aerosil to bond the bearing flange to the hull, allowing the resin to flow through pre-drilled holes to lock the piece in place.8:52 After aligning the shaft and CV joint, he applies high-torque thread locker to the fasteners.10:55 Although the assembly is currently functional, he plans to disassemble the CV joint later to install the water seal and final cotter pins.21:19 The process confirms that precise alignment and structural lamination are essential for mounting a shaft system within a solid hull section.16:13
More from Entre Terras e Mares
From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



