Sven Yrvindvideo

Permanent Steering ropes and other details.

6. juni 2026 · 5 min · 3K visninger · Sweden

Hva denne videoen dekker

Sven Yrvind installs and adjusts permanent steering ropes on a small boat, working through one of hundreds of small finishing details before departure.3:11 Two ropes had mismatched lengths — one too short, one too long — and he corrects both, color-coding them by side: red on port.3:02 The steering system runs from two positions: the cockpit and a hatch above the sleeping room, with the tiller connected by ropes that run to each station.4:06 He secures the ropes in place using concrete to hold them.4:30 Separately, he locates a fitting used to tighten the center lockers, positioning it forward where it gives better leverage when forcing hatches down in heavy weather.1:20 Battery wiring is also routed and checked.1:49 Touch-up painting in Swedish national colors — yellow and blue — is underway, with Yrvind identifying bare spots on the hull that need coverage.2:15 He notes the work is incremental: two details done, hundreds remaining.4:46

Se på YouTube

Mer fra Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.okt. 2026Nervously Cutting the Divinycell Sheets.okt. 2026Trying to Get the Sheerline Right.okt. 2026More molds up.okt. 2026

Fra Sven Yrvind – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem