Sven Yrvindvidéo
Permanent Steering ropes and other details.
6 juin 2026 · 5 min · 3K vues · Sweden
Ce que couvre cette vidéo
Sven Yrvind installs and adjusts permanent steering ropes on a small boat, working through one of hundreds of small finishing details before departure.3:11 Two ropes had mismatched lengths — one too short, one too long — and he corrects both, color-coding them by side: red on port.3:02 The steering system runs from two positions: the cockpit and a hatch above the sleeping room, with the tiller connected by ropes that run to each station.4:06 He secures the ropes in place using concrete to hold them.4:30 Separately, he locates a fitting used to tighten the center lockers, positioning it forward where it gives better leverage when forcing hatches down in heavy weather.1:20 Battery wiring is also routed and checked.1:49 Touch-up painting in Swedish national colors — yellow and blue — is underway, with Yrvind identifying bare spots on the hull that need coverage.2:15 He notes the work is incremental: two details done, hundreds remaining.4:46
Plus de vidéos de Sven Yrvind
De Sven Yrvind — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



