Sven Yrvindvideo
Permanent Steering ropes and other details.
June 6, 2026 · 5 min · 3K views · Sweden
What this video covers
Sven Yrvind installs and adjusts permanent steering ropes on a small boat, working through one of hundreds of small finishing details before departure.3:11 Two ropes had mismatched lengths — one too short, one too long — and he corrects both, color-coding them by side: red on port.3:02 The steering system runs from two positions: the cockpit and a hatch above the sleeping room, with the tiller connected by ropes that run to each station.4:06 He secures the ropes in place using concrete to hold them.4:30 Separately, he locates a fitting used to tighten the center lockers, positioning it forward where it gives better leverage when forcing hatches down in heavy weather.1:20 Battery wiring is also routed and checked.1:49 Touch-up painting in Swedish national colors — yellow and blue — is underway, with Yrvind identifying bare spots on the hull that need coverage.2:15 He notes the work is incremental: two details done, hundreds remaining.4:46
More from Sven Yrvind
From Sven Yrvind — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



