Sven Yrvindvideo
Permanent Steering ropes and other details.
6 giugno 2026 · 5 min · 3K visualizzazioni · Sweden
Cosa tratta questo video
Sven Yrvind installs and adjusts permanent steering ropes on a small boat, working through one of hundreds of small finishing details before departure.3:11 Two ropes had mismatched lengths — one too short, one too long — and he corrects both, color-coding them by side: red on port.3:02 The steering system runs from two positions: the cockpit and a hatch above the sleeping room, with the tiller connected by ropes that run to each station.4:06 He secures the ropes in place using concrete to hold them.4:30 Separately, he locates a fitting used to tighten the center lockers, positioning it forward where it gives better leverage when forcing hatches down in heavy weather.1:20 Battery wiring is also routed and checked.1:49 Touch-up painting in Swedish national colors — yellow and blue — is underway, with Yrvind identifying bare spots on the hull that need coverage.2:15 He notes the work is incremental: two details done, hundreds remaining.4:46
Altro da Sven Yrvind
Da Sven Yrvind — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



