Sven Yrvindvídeo

Permanent Steering ropes and other details.

6 de junio de 2026 · 5 min · 3K visitas · Sweden

Qué cubre este vídeo

Sven Yrvind installs and adjusts permanent steering ropes on a small boat, working through one of hundreds of small finishing details before departure.3:11 Two ropes had mismatched lengths — one too short, one too long — and he corrects both, color-coding them by side: red on port.3:02 The steering system runs from two positions: the cockpit and a hatch above the sleeping room, with the tiller connected by ropes that run to each station.4:06 He secures the ropes in place using concrete to hold them.4:30 Separately, he locates a fitting used to tighten the center lockers, positioning it forward where it gives better leverage when forcing hatches down in heavy weather.1:20 Battery wiring is also routed and checked.1:49 Touch-up painting in Swedish national colors — yellow and blue — is underway, with Yrvind identifying bare spots on the hull that need coverage.2:15 He notes the work is incremental: two details done, hundreds remaining.4:46

Ver en YouTube

Más de Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.oct 2026Nervously Cutting the Divinycell Sheets.oct 2026Trying to Get the Sheerline Right.oct 2026More molds up.oct 2026

De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema