Sven Yrvindβίντεο
Permanent Steering ropes and other details.
6 Ιουνίου 2026 · 5 λεπτά · 3K προβολές · Sweden
Τι καλύπτει αυτό το βίντεο
Sven Yrvind installs and adjusts permanent steering ropes on a small boat, working through one of hundreds of small finishing details before departure.3:11 Two ropes had mismatched lengths — one too short, one too long — and he corrects both, color-coding them by side: red on port.3:02 The steering system runs from two positions: the cockpit and a hatch above the sleeping room, with the tiller connected by ropes that run to each station.4:06 He secures the ropes in place using concrete to hold them.4:30 Separately, he locates a fitting used to tighten the center lockers, positioning it forward where it gives better leverage when forcing hatches down in heavy weather.1:20 Battery wiring is also routed and checked.1:49 Touch-up painting in Swedish national colors — yellow and blue — is underway, with Yrvind identifying bare spots on the hull that need coverage.2:15 He notes the work is incremental: two details done, hundreds remaining.4:46
Περισσότερα από το Sven Yrvind
Από Sven Yrvind — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



