Entre Terras e Maresvideo

SERÁ QUE VAI DAR PARA TOMAR BANHO AI? T1.ep171

22 March 2026 · 10 min · 337 views

What this video covers

Edgar works on the bathroom renovation for the boat, focusing on fabricating fiberglass panels for the shower stall walls and ceiling.Watch He creates paper templates for the irregular hull sections, noting that the width requires cutting the fiberglass sheets into two pieces with a seam.Watch Before bonding the panels, he laminates specific points on the hull and applies a filler to smooth out the uneven surface.1:40 High ambient temperatures cause the gelcoat to catalyze too quickly, forcing him to move the glass work surface into the shade and use water to cool it before cleaning with thinner and applying carnauba wax and a release agent.4:15 While he successfully produces one panel and a corner trim piece, a gelcoat failure prevents further progress on the remaining walls.6:41 Additionally, Edgar cuts the countertop for the aft cabin bathroom sink and evaluates the dimensions for a vessel-style sink, which may require structural modifications to the adjacent cabinet doors to accommodate the faucet.7:27

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue