Sven Yrvindvídeo
2 Masts down, ready for the trailer.
8 de septiembre de 2026 · 2 min · 5K visitas
Qué cubre este vídeo
Sven Yrvind prepares his boat for transport by lowering the two foremasts and the boom.0:53 He secures the spars using knots and black lifting ropes to ensure they remain stationary during transit.1:03 The boom requires additional clearance and a secondary knob to improve stability, though he prioritizes launching the boat over making these mechanical refinements.0:14 He removes the wheels and adjusts the screws to finalize the configuration for the trailer.1:55 The process highlights the iterative nature of boat rigging, where initial tolerances often require adjustment after the first assembly.
Más de Sven Yrvind
De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



