Sven Yrvindvídeo

2 Masts down, ready for the trailer.

8 de setembro de 2026 · 2 min · 5K visualizações

O que este vídeo aborda

Sven Yrvind prepares his boat for transport by lowering the two foremasts and the boom.0:53 He secures the spars using knots and black lifting ropes to ensure they remain stationary during transit.1:03 The boom requires additional clearance and a secondary knob to improve stability, though he prioritizes launching the boat over making these mechanical refinements.0:14 He removes the wheels and adjusts the screws to finalize the configuration for the trailer.1:55 The process highlights the iterative nature of boat rigging, where initial tolerances often require adjustment after the first assembly.

Assistir no YouTube

Mais de Sven Yrvind

Back to Work.set. de 2026A Non Bloated Boat in a Bloated World.set. de 2026No access to boat sat and sunday.set. de 2026Fixing water collection and trailer adaption.set. de 2026

De Sven Yrvind — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema