Sven Yrvindvideo

2 Masts down, ready for the trailer.

8 September 2026 · 2 min · 5K views

What this video covers

Sven Yrvind prepares his boat for transport by lowering the two foremasts and the boom.0:53 He secures the spars using knots and black lifting ropes to ensure they remain stationary during transit.1:03 The boom requires additional clearance and a secondary knob to improve stability, though he prioritizes launching the boat over making these mechanical refinements.0:14 He removes the wheels and adjusts the screws to finalize the configuration for the trailer.1:55 The process highlights the iterative nature of boat rigging, where initial tolerances often require adjustment after the first assembly.

Watch on YouTube

More from Sven Yrvind

Back to Work.Sept 2026A Non Bloated Boat in a Bloated World.Sept 2026No access to boat sat and sunday.Sept 2026Fixing water collection and trailer adaption.Sept 2026

From Sven Yrvind — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue