Entre Terras e Maresvideo

Finalmente começamos a instalar o eixo Parte 1 T1.ep165

February 8, 2026 · 26 min · 586 views

What this video covers

Edgar installs the propulsion shaft on his Allegro Vivace sailboat, tackling a custom drivetrain layout that required a CV joint (junta homocinética) because the engine must sit horizontal rather than angled to match the shaft.3:10 Fabrication shop Dickman produced the shaft, bearing housing (mancal), and a flange adapting the CV joint to the motor shaft; the bearing mounts in a laminated structure inside the hull, with a Volvo-pattern shaft seal chosen for its compact footprint.4:31 The central problem in this session is a bronze bushing that refuses to seat in the shaft tunnel: welding the tunnel's internal support bracket earlier deformed the tube, tightening the bore.15:56 Edgar spends five to six hours grinding the 51 mm stainless-steel 316 tube with sandpaper, fabricates a wooden sanding tool sized to roughly 49–50 mm using a hole saw, and attempts repeated lubricated hammer-drives.23:12 The bushing stops about one centimeter short of full seating by the end of the session.24:39 Edgar confirms in a closing note that it eventually seated well enough to continue assembly, covered in Part 2.25:52 Welding internal tunnel fittings after final machining risks bore distortion that can block press-fit components.

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue